If opening means a lap around the lights, the doors, the windows, and the equipment, the job missed something. Full build or remodel, we put that in from the start, the same way you'd finish a smart house, and if the place needs robots, we leave each one a spot before the walls close up.
You've been in a house where you don't think about the lights, the heat, or the lock. We build restaurants that way. Italian, American, barbecue, breakfast diners, and plenty of other styles. The kitchen goes on the drawings too, so the equipment isn't a second project after the dining room looks finished.
Kitchen bright and the equipment on before you open. Dining room dimmed once people sit down. Lights, air, and equipment off at the end of the night. Set once, so nobody walks the room to do it.
Front door, patio sliders, windows. They open and lock with the building, instead of being the last thing somebody remembers.
One for the floors, one on the dining room, maybe one in the back. Each gets clearance, an outlet, and a charger while the studs are still showing.
You don't need a presentation. Tell us what the building still makes somebody do by hand. We'll say what should run on its own and what should stay with a person.
What gets switched on before service. What somebody still walks over to do. What you want off at the end of the night. We take care of that step for you and automate it.
Some things happen when you unlock the door. Some wait until you're busy. Some shut down at close. We write that before we draw.
Wiring, controls, doors, windows, and the appliances that can take a signal. If it has to be fished in after the finishes, we missed it.
One robot in a building that wasn't drawn for it is already a problem. A few of them is worse. Power, room to turn, and a charger for each one go on the plan with the lights.
A full build, or a remodel of the restaurant you already have. We'll tell you what we'd automate and what we'd leave in somebody's hands.
Ask Us to Come Look